The below figure shows the result of the linearity test. It looks like B1,R1 and R2 are fairly linear up to an exposure time of 30 seconnds. B2 has got some bumps in between. Need to investigate B2 behaviour in detail.
I am currently employed as 'Survey Operations Scientist' for eBOSS project in SDSS-IV. I would like to briefly explain the kind of challenges I encounter in my role as eBOSS survey operation scientist. This will mostly serve as a log of my SDSS related work.
Tuesday, August 23, 2016
Post Summer Shutdown Calibrations : Linearity Test
The below figure shows the result of the linearity test. It looks like B1,R1 and R2 are fairly linear up to an exposure time of 30 seconnds. B2 has got some bumps in between. Need to investigate B2 behaviour in detail.
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment